News
Read Articles and the latest industry news from ProChem Inc.
Read articles and the latest industry news from ProChem.



ProChem provides on-site pilot testing to demonstrate a treatment program’s performance in a live environment. Pilot tests provide an opportunity to optimize and enhance the performance of the program on site, so that our customers are confident that what they purchase meets their goals. We recently designed a compact and fully loaded pilot system that will operate at a customer site for several weeks to demonstrate how the full-scale process would work, removing up to 99.5% of dissolved salts and virtually all colloidal and suspended matter from their water source.

The system will produce a high-quality water yield at a low cost compared to other purification processes. Before the pilot system leaves ProChem's warehouse, our Water Systems team is putting it through its paces to ensure safety, quality, and ease of installation at the customer site. The pilot system is simple to install using feed connections for the city water it will treat. It comes complete with operations documentation and log forms for test data collection. The technology components featured on this pilot system include:

  • ProChem’s I-PRO, high-pressure Reverse Osmosis unit
  • Chemical feed system and conical bottom feed tank
  • Membrane clean-in-place system

The whole system is only 65" tall x 54" long x 36" deep. That's a lot of technology packed into a neat little package.