Low Maintenance Solution
A Case Study

ProChem Replaces High-Maintenance System with Innovative Solution

The Customer
An automotive parts manufacturing facility whose manufacturing processes introduce heavy metals into their wastewater.

The Problem
The facility was experiencing frequent maintenance issues and excessive downtime with their aging, existing wastewater treatment system. They were looking for an updated, lower-maintenance wastewater treatment solution.

The ProChem Solution
After completing the water analysis and assessing the facility’s production goals, ProChem provided a new wastewater treatment solution. This solution was a batch wastewater treatment system, utilizing ProChem physical/chemical treatment and ion-exchange technologies to remove heavy metals from their wastewater and require minimal equipment maintenance.

This system is equipped with local monitoring and automation controls, requiring minimal operator interaction.

With this innovative solution in place, the facility is experiencing minimal system maintenance and 100% discharge permit compliance.

The Win

  • Eliminated system maintenance and performance issues
  • 100% discharge permit compliance